top of page

MAYFAIR | LONDO| W1

A 800 sq ft first floor flat within Grosvenor Estate.

Working  closely with Grosvenor Estate carrying out light internal structural reconfiguration works to improve existing layout. Full refurbishment of the interior with new fixtures, fittings and floor finishes. Relocation of the kitchen to the living room. Conversion of the existing kitchen into a second bedroom. Relocation of a new boiler and adjustment of the flue route. Enlargement of the shower room – including the partial removal of a non-loadbearing wall. Works include replacement of the services within the flat – drainage, electrics, water and heating.

IN THE BEGINNING…

DURING CONSTRUCTION…

bottom of page